
Logistics
Black Sea lead times: planning around congestion
Berth waiting times at the main Black Sea grain and fertilizer terminals have stabilised, but inland trucking is now the bottleneck.
Published August 21, 2026 · 3 min read · Super Admin
Berth waiting at the main Black Sea terminals has come down from the peaks of last winter, yet total door-to-door lead times have barely improved.
The reason is inland: truck availability between production sites and the port gate now sets the schedule. We plan loading windows backwards from truck capacity, not from vessel ETA.
All insights

Urea market outlook: what buyers should watch this autumn
Granular urea pricing has tracked energy costs more closely than demand this season. Three factors decide where CFR levels settle.

Independent inspection is now standard on every shipment
Third-party sampling, laboratory analysis and draft survey are included by default, not offered as an extra.